Moving Nodes or Subnets to another Subnet
There are four ways you can move nodes and subnets from one subnet to another:
-
Drag and drop from the Network Browser treeview – Select one or more nodes in the treeview; then drag the selection to a subnet icon in the treeview or the workspace.
For more information about the Network Browser, see “Show Network Browser” on page 149.
-
Shift-drag and drop within the Project Editor workspace – Select one or more nodes; then hold down the Shift key and drag the selection over a subnet icon.
-
Move Selected Nodes into Specific Subnet – Select one or more nodes and do one of the following:
- choose Topology > Subnets > Move Selected Nodes into Specific Subnet…, and select the subnet
- right-click on the workspace and select “Move Selected Nodes Into Specific Subnet…, and select the subnet
-
Move Selected Nodes to Parent Subnet – Select one or more nodes and do one of the following:
- choose Topology > Subnets > Move Selected Nodes Into Parent Subnet
- right-click on the workspace and select “Move Selected Nodes to Parent Subnet”
All four operations move the selected nodes to the new subnet and retain all attached links, paths, and demands. If the positions of the relocated nodes do not fall within the target subnet's bounds, the subnet layout is refreshed to determine the new node positions.