Workflow
Typical server modeling project should follow the workflow shown below:
Figure 480: Server Modeling Workflow

In the Data Collection phase the server and applications to be modeled are identified and relevant data traces to model them is collected. In the Pre-Analysis phase the server data is used to characterize workload. The Server Characterization Editor (SCE) module is a pre-analysis tool, see the SCE User Guide for more information about data collection and pre-analysis phases.
The model definition and validation phase involves creating a model of the server in question and its network environment. Activities performed in the performance prediction phase depends on why the server is being modeled. The SSM can be used for these two phases.