Ets_Pj_Scenario_Index_Set()
Note: Requires OPNET Development Kit
Abstract
Reorders a scenario in a project.
Syntax
Ets_Pj_Scenario_Index_Set (pj_hndl, scenario_name, index)
| Argument | Type | Description |
|---|---|---|
pj_hndl |
EtsT_Model_Handle |
Project of interest. |
scenario_name |
const char * |
Scenario of interest. |
index |
int |
Index number to be set for the scenario (must be 0 or greater) |
Return Type
EtsT_Compcode
EtsC_Compcode_Success if the scenario index is set successfully; EtsC_Compcode_Failure otherwise.
Header
ets_api_pj.h
Details
This function changes the order of a scenario in a project (that is, the order shown in the Manage Scenarios list). The specified scenario is moved to position index and any scenarios originally at position index and higher are renumbered.